90 | 2014.11 | Current | SHI | Royal Dutch Shell Prelude Project | LNG FPSO | SHI | MC, Commissioning Service (Walk down, Punch killing for All parts) |
89 | 2015.01 | Current | SHI | STENA Semi-Rig Project | Semi-Rig | SHI | MC/Commissioning Procedures |
88 | 2015.03 | Current | DSME | Vantage Project | Drillship | DSME | Commissioning Service, Watch duty & Document |
87 | 2015.04 | Current | DSME | Sonangol Project | Drillship | DSME | Commissioning Service, Watch duty & Document |
86 | 2015.06 | Current | DSME | Drillships | Drillships | DSME | Watch duty & Document |
85 | 2015.06 | Current | DSME | Chevron Mafumeirea Sul Project | Fixed Platform | DSME | Offshore(Angola) Commissioning Service |
84 | 2015.07 | Current | DSME | INPEX Ichthys FPSO Project | FPSO | DSME | Preservation, Commissioning Service(Telecom, E&I, HVAC, Loop) |
83 | 2015.07 | Current | DSME | Merchant Vessels | Merchant Vessel | DSME Mangalia Shipyard | Commissioning Service |
82 | 2015.11 | Current | SHI | BP Cat-J Project | Jackup-Rig | SHI | MC/Punch |
81 | 2016.05 | Current | SHI | PDC #8 | Drillship | SHI | Preservation & Lay-up |
80 | 2016.06 | Current | DSME | Statoil Mariner Project | Fixed Platform | DSME | Commissioning Service |
79 | 2013.04 | Current | SHI | Royal Dutch Shell Prelude Project | LNG FPSO | SHI | Commissioning Procedures & Documetation Service |
78 | 2013.08 | Current | SHI | All LNGCs | LNGC | SHI | LNG Cold Test/Gas Trial Documentation Service |
77 | 2013.10 | Current | SHI | All Ships | | SHI | Vibration Test & Noise Measurement Service |
76 | 2015.05 | Current | SHI | Pentronas FLNG 2 Project | FLNG | SHI | Commissioning Procedures/Operation Test Procedures |
75 | 2015.05 | Current | HHIC | NYK | LNG Bunkering Vessel | HHIC | Operating Manual (Machinery) |
74 | 2015.05 | Current | DSME | KOGAS, KLC | LNGC | DSME | Operating Manual (Cargo/Machinery) |
73 | 2015.05 | Current | DSME | KOGAS, HLS | LNGC | DSME | Operating Manual (Cargo/Machinery) |
72 | 2016.04 | Current | CSE Transtel | INPEX Ichthys FPSO Project | FPSO | DSME | Vendor Support/Commissioning Service(Telecom) |
71 | 2016.04 | Current | CSE Transtel | INPEX Ichthys CPF Project | CPF | SHI | Vendor Support/Commissioning Service(Telecom) |
70 | 2016.06 | Current | Cegelec/AMA | INPEX Ichthys CPF Project | CPF | SHI | Instrument Supervisors/Technicians |
69 | 2016.08 | Current | SHI | Total Egina FPSO project | FPSO | SHI | MC, Punch Killing, Piping Coordinator |
68 | 2016.09 | Current | SHI | INPEX Ichthys CPF Project | CPF | SHI | Telecom System Punch Killing |
67 | 2016.11 | Current | Samwon Corporation | KIMFT Fisheries Training Boat | Special Ship | Samwon | Noise & Vibration Analysis/Measurment |
66 | 2013.03 | Current | SK Energy | Ulsan Complex | Refinery/LNG | Ulsan, Korea | Leak Sealing (Valves) |
65 | 2013.03 | Current | SK Global Chemical | Ulsan Complex | Petrochemical | Ulsan, Korea | Leak Sealing (Valves) |
64 | 2014.01 | Current | S-Oil | Onsan factory | Refinery/LNG | Ulsan, Korea | Leak Sealing (Valves) |
63 | 2013.01 | Current | Korea Zinc | Ulsan factory | Smeltery(Zinc) | Ulsan, Korea | Fan & Valve Maintenance |
62 | 2014.01 | Current | HPS | Hadong Branch | Thermal Power Plant | Kyoungnam, Korea | Boiler & Turbine Valve Maintenance |
61 | 2014.01 | Current | Lotte Chemical | Ulsan factory | Petrochemical | Ulsan, Korea | Leak Sealing (Control Valves) |
60 | 2015.01 | Current | Sam Yang | Ulsan factory | Petrochemical | Ulsan, Korea | Dryer & Reducer Overhaul |
59 | 2013.01 | Current | KOC | Ulsan factory | Petrochemical | Ulsan, Korea | T/A Fan Overhaul |
58 | 2015.01 | Current | Wonil | Head Office | ETC | Gyeonggi-do, Korea | T/A Valve Maintenance |
57 | 2015.07 | 2016.12 | DSME | Sea Tankers | LNGC | DSME | Operating Manual (Cargo/Machinery) |
56 | 2016.06 | 2016.09 | Jawon Development | Sand Carrier Project | Sand Carrier | Sekwang | TV Measurement, TV Calculations Report |
55 | 2015.09 | 2016.06 | DSME | Statoil Gina Krog Project | Fixed Platform | DSME | MC, Commissioning Service, Loop Test |
54 | 2016.06 | 2016.06 | ABS Consulting | Cochin Shipyard Construction | Shipyard | Chochin Sgipyard | LNG Dock Construction |
53 | 2015.07 | 2016.05 | DSME | Dong Hejre Project | Fixed Platform | DSME | MC, Commissioning Service |
52 | 2014.05 | 2016.05 | Technip | Petronas FLNG Project | FLNG | DSME | QA / Commissioning Service |
51 | 2016.03 | 2016.05 | Jcon | Head Office | Petrochemical | Ulsan, Korea | FCC T/A Tube Sampling |
50 | 2013.05 | 2016.04 | SHI | | Container | SHI | Commissioning Service |
49 | 2016.03 | 2016.04 | Technip | Petronas FLNG Project | FLNG | DSME | Turret Commissioning & Rotation Test |
48 | 2013.12 | 2016.03 | Statoil | Statoil Heidru Project | FPU | SHI | Commissioning Procedures |
47 | 2015.12 | 2016.03 | ISOICO | | Container | ISOICO | Vibration/Noise, Ship Speed, Shaft Torque/Torsion Measurement |
46 | 2016.02 | 2016.03 | DSME | Merchant Vessels | Merchant Vessels | DSME | Sea Trial |
45 | 2014.01 | 2016.03 | Hydratight | BP Quad204 Project | FPSO | HHI | Flange Management Service |
44 | 2014.01 | 2016.03 | Hydratight | BP Clair Ridge Project | Fixed Platform | HHI | Flange Management Service |
43 | 2015.05 | 2016.03 | PPSSL | BP Quad204 Project | FPSO | HHI | Logistics |
42 | 2014.03 | 2016.02 | STX | MOG Gaza Project | FSO | STX | QA/QC, Document Control, Commissioning Service |
41 | 2014.04 | 2016.02 | DSME | Songa Offshore Projects | Drilling Rigs | DSME | MC, Commissioning Service |
40 | 2015.01 | 2016.02 | DSME | Songa Offshore Projects | Drilling Rigs | DSME | Loop Test, HVAC Comm'g |
39 | 2014.06 | 2016.01 | DSME | Petronas FLNG Project | FLNG | DSME | Document Control/Commissioning Service |
38 | 2013.06 | 2016.01 | Hydratight | Chevron Gorgon LNG Project | Fixed Platform | HHI | Flange Management Service |
37 | 2015.07 | 2015.12 | KIMFT | KIMFT DP NI Accreditation | DP | KIMFT | DP NI Accreditation Consulting |
36 | 2015.03 | 2015.12 | SK Lubricants | Ulsan Complex | O&G | Ulsan, Korea | Leak Sealing (Valves) |
35 | 2015.10 | 2015.11 | Bumjin E&C | Ulsan Branch | ETC | Seoul, Korea | Valve Maintenance |
34 | 2015.01 | 2015.08 | SHI | Seadrill Drillship Project | Drillship | SHI | MC |
33 | 2015.02 | 2015.08 | DSME | UK | MARS Tanker | DSME | Maintenance Procedures |
32 | 2014.12 | 2015.07 | SHI | ENSCO Drillship Project | Drillship | SHI | MC |
31 | 2015.05 | 2015.06 | Solvay | Ulsan factory | Petrochemical | Ulsan, Korea | Pump Overhaul |
30 | 2014.12 | 2015.03 | SHI | QGOG Drillship Project | Drillship | SHI | MC |
29 | 2015.01 | 2015.03 | EG Metal | Ulsan factory | ETC | Ulsan, Korea | Roller, Shaft & Pulley Repair |
28 | 2014.10 | 2015.02 | DSME | Chevron Mafumeirea Sul Project | Fixed Platform | DSME | MC, Commissioning Service |
27 | 2012.03 | 2015.02 | QGOG | QGOG Drillship Projects | Drillship | SHI | Document/Training Service |
26 | 2014.07 | 2014.12 | DSME | Chevron Wheatstone Project | Fixed Platform | DSME | MC, Commissioning Service |
25 | 2014.06 | 2014.11 | DSME | Allseas PLV Project | PLV | DSME | Mechanical Completion(MC), Watch duty & Document |
24 | 2014.06 | 2014.11 | SPIE | Onshore Project | Gas Field | Samsung/Daewoo Eng. | Logistics |
23 | 2014.06 | 2014.10 | DSME | Merchant Vessels | Merchant Vessels | DSME | Watch duty & Document |
22 | 2014.06 | 2014.10 | Cegelec/AMA | Royal Dutch Shell Prelude Project | LNG FPSO | SHI | Vendor Support/Commissioning Service |
21 | 2013.03 | 2014.09 | TMS Cardiff | | LNGC | DSME | Consultancy Service |
20 | 2014.07 | 2014.09 | Bansan | Head Office | ETC | Ulsan, Korea | Valve Maintenance |
19 | 2014.05 | 2014.07 | TYCO | Petronas FLNG Project | FLNG | DSME | Vendor Support/Commissioning Service |
18 | 2014.05 | 2014.06 | Aggreko | ExxonMobil Arkutun-Dagi Project | Fixed Platform | DSME | Vendor Support/Commissioning Service |
17 | 2013.01 | 2014.05 | Teekay Petrojarl | Teekay Knarr Project | FPSO | SHI | Commissioning Service |
16 | 2013.05 | 2014.05 | DSME | ExxonMobil Arkutun-Dagi Project | Fixed Platform | DSME | Total Commissioning Service + Document Control (Tiger Team) |
15 | 2013.10 | 2014.05 | DSME | ExxonMobil Arkutun-Dagi Project | Fixed Platform | DSME | Total Comm. Service + Document Control (Tiger Team)-Add. |
14 | 2013.01 | 2014.05 | Teekay Corporation | Shuttle Tanker | Tanker | SHI | Consultancy Service |
13 | 2014.02 | 2014.03 | DSME | Royal Dock | Royal Dock | DSME | Consultancy Service-Specification |
12 | 2013.07 | 2013.12 | Sungdong | Hanjin Shipping | Container | Sungdong | Commissioning Service |
11 | 2013.11 | 2013.11 | Roteceng | Head Office | ETC | Ulsan, Korea | FCC T/A Gasket Change |
10 | 2013.03 | 2013.10 | IK Tec | Ulsan factory | Thermal Power Plant | Ulsan, Korea | P/P Turbine & Boiler Valve Maintenance |
9 | 2013.08 | 2013.09 | KEPCO KPS | Yongnam Branch | Thermal Power Plant | Ulsan, Korea | Pump & Turbine Valve Maintenance |
8 | 2013.07 | 2013.09 | Hansako ENG | Head Office | ETC | Ulsan, Korea | Valve Maintenance |
7 | 2013.06 | 2013.09 | UBEC | Head Office | ETC | Ulsan, Korea | FCC T/A Heat Exchanger Maintenance |
6 | 2012 | 2013.08 | Subtech Qatar | RasGas Barzan Gas Project | Fixed Platform | | Consultancy Service |
5 | 2012 | 2013.08 | Pipeline Induction Heat | RasGas Barzan Gas Project | Fixed Platform | | Consultancy Service |
4 | 2012 | 2013.08 | Applus RTD | RasGas Barzan Gas Project | Fixed Platform | | Consultancy Service |
3 | 2013.06 | 2013.08 | Hydratight | RasGas Barzan Gas Project | Fixed Platform | HHI | Flange Management Service |
2 | 2013.01 | 2013.07 | Golar LNG | | LNGC | SHI | Consultancy Service |
1 | 2012.09 | 2013.03 | Sungdong | PTSC BienDong Project | FSO | Sungdong | MC/Commissioning Procedures/Onshore,Offshore Comm'g Service |